NWA Quality Monitor Payback Calculation

Investment in Plant-Floor Quality Data Collection and Analysis Software

A case study that shows how data collection and analysis software like NWA Quality Monitor can actually help to save thousands of pounds a year. Read how one premium dry petfood company solved overfill and take a look at their actual payback calculation that demonstrates their savings.

PAYBACK AT A GLANCE
Problem: Overfill leading to excessive product giveaway.
Solution: Implemented NWA Quality Monitor data collection and analysis software to identify sources of excessive variation leading to overfill, and to monitor process improvements.
Cost Savings: £435,739
Payback: 10.7 days

In tough economic times, resources are tight and directed at the investments that bring in the most revenue or result in the greatest cost savings. How can a plant-floor quality data collection and analysis system like NWA Quality Monitor help you meet these objectives?

This payback calculation illustrates a real-life example of how one American manufacturer was able to reduce its giveaway due to overfill by 50%, resulting in annual savings of £435,739 and a payoff of their Quality Monitor investment in just 10.7 days.

Situation

An American manufacturer of premium dry pet food is producing 39 million pounds (10,011,808 packages) of product per year, 829,978 pounds (or 27 truckloads) of which is overfill, resulting in £871,477 in product giveaway costs.

Overfill = (10,011,808 pkgs/yr)  x ( 3.8954  –  3.8125 ) =  829,978 pounds of overfill per year
( Avg fill weight
per pkg
 – 
net weight pkg
declaration
)

Cost of Overfill = (829,978 lbs/yr) x (£1.05/lb) = £871,477 in overfill costs per year

Solution

The American manufacturer implemented a system to identify the causes of the overfill and improve monitoring of the manufacturing process. At the end of the packaging line, a scale was set up to electronically input sample weights into a test station running NWA Quality Monitor. Quality Monitor used this data to produce X-bar and Range charts enabling early identification of the sources of excessive variation. It also generated Process Capability histograms to monitor the process improvement efforts and to decide how much closer they could move their targets to the declared limit. The total cost of the system, including installation, hardware, software and training was £15,000.

Results

  1. The manufacturer identified and corrected the causes of the overfill and gained tighter control of its process, allowing it to eliminate 50% of its giveaway costs, or £435,739 per year.
  2. The manufacturer realized enough savings in just 10.7 days to fully pay for its investment in NWA Quality Monitor.

Savings = 50% x £871,477 = £435,739 in giveaway cost savings per year

Payback = (£15,000/£435,739) x 312 production days per year = 10.7 days to payback

Newsletter

Hier geht es weiter

Was sagen unsere Kunden über uns?

Hi Bob, Thank you so much for this and your prompt reply. It is such a relief, I can’t tell you! I will try downloading it now. I can’t thank you enough for your kindness as well as efficiency.

C

Thanks again for your help. EndNote is a great product and I am constantly telling students, colleagues and friends about it.

JS, Dundee, UK

Your technicians are always really friendly, reassuring and helpful.

HM, Cambs, UK

Course was excellent, Bob was very thorough, covering a lot of ground. The content was just what was required. Very pleased!